Mount Golf Club: The Dunes Driving Range, Tauranga
An over-budget concept turned into an asset earning revenue from the day it opened.
An underused corner of the course, turned into one of the best practice facilities in Australasia. The old range was too small, with balls leaving the property, so a solution was needed. The concept design was over budget when Drive was engaged.
We led the client and design team through value engineering to ensure the project was a success and the goal of revenue to the club was achieved from day one. We then finalised design co-ordination, contractor procurement and construction management. The finished range provides 15 outdoor bays with simulator technology, two indoor simulators, and an upper-level reception and bar opening onto a function space with access to the bays.
It opened in July 2025 as the second phase of the club's $3m Dunes development. For a not-for-profit club funding half the build from grants, sponsorship and reserves, getting the project on budget was the main goal.